Sawyer Systems provides on-site installation services for our hydraulic systems. This includes installing the inter-connecting piping system and our electrical control products. Installation projects can last for days, weeks or years.
Our field crews operate out of mobile shop fabricated from a standard 40 foot shipping container. We have multiple mobile shops that allow us to work on more than one major project at a time. The shops provide for on-site fabrication capabilities and organized storage for tools, safety gear and installation materials.
We install fully welded and non-welded piping systems in carbon steel, stainless steel and super duplex tubing. The systems are designed with 3D modeling and fit into the client’s model prior to installation to avoid interferences with the other equipment, piping and electrical systems.
Once the system is installed, each pipe run is flushed to a specification, pressure tested and certified ready for operation. Our crews continue on-site through commissioning of the equipment to guarantee a successful system.
The picture on the right is part of a fully welded pre-engineering system for the Blow-Out Preventer on an oil drilling rig. The entire system was designed in 3D, shop manufactured, shipped to the jobsite and installed with our crews. Shop fabrication can save up to 30% of the total installation costs.
The pictures below are links to other projects on oil & gas drilling rigs and dredges. Selecting each picture will show more examples of our installation capabilities and further information of their specific applications.